CO-OPS Field Library

manuals, operating procedures, publications and more
View All

52 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf
Author: Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf
Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf
Author: Darren Wright, James Sprenke, Charles Payton
Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf
Author: Adam Grodsky, COET
Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf
Author: Engineering Division, CO-OPS
Keywords/Tags: bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical
3.2.3.3.C4_Users_Guide_for_GPS_Observations.pdf
Author: Manoj Samant, Artara Johnson
Keywords/Tags: global positioning system, gps, observations, terrestrial reference frame, itrf, north american datum of 1983, nad 83, online positioning user service, opus, opusdb, national geodetic survey, ngs, static, gps observation, differential, gps surveys, gps satellites, choke ring antenna, ground plane antenna, fixed-height tripod, epoch update, recording interval, elevation mask, north american vertical datum of 1988, navd 88, national spatial reference system, nsrs, orthometric, ellipsoidal navd 88 level tie, gps tie, stability code, federal base network, fbn, cooperative base network, cbn, gps water level station bench mark, gpsbm, photos, cors
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf
Author: FOD
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf
Author: CIL
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf
Author: Carl Kammerer
Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf
Author: Chris Paternostro
Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf
Author: Thomas F. Landon
Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf
Author: Richard Bourgerie
Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf
Author: FOD Team Leads
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf
Author: Jason Standridge
Keywords/Tags: SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf
Author: Christopher McGrath
Keywords/Tags: current meter; horizontal; field library; operations; maintenance
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf
Author: Christopher Paternostro;Richard Bourgerie
Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf
Author: Adam Grodsky
Keywords/Tags: SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf
Author: Bruce Sevary
Keywords/Tags: reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx
Author: Greg Dusek
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf
Author: Seth Baldelli
Keywords/Tags: met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf
Author: Carl Kammerer
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf
Author: Richard.Edwing
Keywords/Tags: NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.6.F10_Currents_Risk_Assessment.pdf
Author: Manoj Samant
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf
Author: Jason Standridge
Keywords/Tags: geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf
Author: SIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf
Author: Chris McGrath
Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I34_EB_17-005_Standardize_MWWL_Sensor_Configuration_Parameters.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf
Author: CIL;SIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf
Author: SIL;CIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf
Author: CIL;SIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf
Author: SIL;CIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf
Author: Caleb Gostnell
Keywords/Tags: SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I42_EB_23-002_CO-OPS_Standard_WaterLOG_Radar_Sensor_Configuration_Parameters.pdf
Author: Chris McGrath
Keywords/Tags: waterlog; radar; MWWL; engineering bulletin; water level; microwave; sensor; configuration; parameters; H-3611; Nile; NOAA Nile; 502; 203360
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf
Author: Chris McGrath
Keywords/Tags: waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile
3.2.3.12.3-L2_cGNSS_Level_Method.pdf
Author: Eric Breuer
Keywords/Tags:
3.2.3.12.3-L3_cGNSS_Metadata.pdf
Author: Adam Grodsky
Keywords/Tags:
Filename Author Keywords/Tags
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Kasey Standridge ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Darren Wright, James Sprenke, Charles Payton SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Adam Grodsky, COET SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf Engineering Division, CO-OPS bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical
3.2.3.3.C4_Users_Guide_for_GPS_Observations.pdf Manoj Samant, Artara Johnson global positioning system, gps, observations, terrestrial reference frame, itrf, north american datum of 1983, nad 83, online positioning user service, opus, opusdb, national geodetic survey, ngs, static, gps observation, differential, gps surveys, gps satellites, choke ring antenna, ground plane antenna, fixed-height tripod, epoch update, recording interval, elevation mask, north american vertical datum of 1988, navd 88, national spatial reference system, nsrs, orthometric, ellipsoidal navd 88 level tie, gps tie, stability code, federal base network, fbn, cooperative base network, cbn, gps water level station bench mark, gpsbm, photos, cors
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf FOD FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf CIL FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Carl Kammerer ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Chris Paternostro ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Thomas F. Landon ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Richard Bourgerie dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf FOD Team Leads SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf Jason Standridge SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Christopher McGrath current meter; horizontal; field library; operations; maintenance
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Christopher Paternostro;Richard Bourgerie CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf Adam Grodsky SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf Bruce Sevary reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Greg Dusek currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Christopher Paternostro currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf Seth Baldelli met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Carl Kammerer currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf Richard.Edwing NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.6.F10_Currents_Risk_Assessment.pdf Manoj Samant FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf Jason Standridge geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf Kasey Standridge, CIL Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf SIL SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf Chris McGrath SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I34_EB_17-005_Standardize_MWWL_Sensor_Configuration_Parameters.pdf Chesapeake Instrument Lab
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf CIL;SIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf SIL;CIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf CIL;SIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf SIL;CIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf Caleb Gostnell SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I42_EB_23-002_CO-OPS_Standard_WaterLOG_Radar_Sensor_Configuration_Parameters.pdf Chris McGrath waterlog; radar; MWWL; engineering bulletin; water level; microwave; sensor; configuration; parameters; H-3611; Nile; NOAA Nile; 502; 203360
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf Chris McGrath waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile
3.2.3.12.3-L2_cGNSS_Level_Method.pdf Eric Breuer
3.2.3.12.3-L3_cGNSS_Metadata.pdf Adam Grodsky
Last modified: 2024-02-22 16:00 UTC