CO-OPS Field Library

manuals, operating procedures, publications and more
View All

21 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf
Author: OSTEP
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf
Author: CIL
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf
Author: Carl Kammerer
Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf
Author: Chris Paternostro
Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.5_CIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
Filename Author Keywords/Tags
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Kasey Standridge ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf OSTEP FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf CIL FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Carl Kammerer ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Chris Paternostro CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.5_CIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf Kasey Standridge, CIL Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab