Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Author: Adam Grodsky;Richard Bourgerie Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD |
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Author: Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Author: Darren Wright, James Sprenke, Charles Payton Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Author: Adam Grodsky, COET Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf Author: Manoj Samant Keywords/Tags: SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf Author: manoj.samant Keywords/Tags: bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Author: Carl Kammerer Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Author: Carl Kammerer, CECAT Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls Author: Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary Keywords/Tags: SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT |
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf Author: Keywords/Tags: |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf Author: Chris McGrath Keywords/Tags: Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf Author: CIL Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf Author: U.S. Department of Commerce Keywords/Tags: expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M |
4.1.3.5_CIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Author: Sutron Corporation Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Author: Thomas F. Landon Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
7.3.B.1.1_C-MIST_User_Manual.pdf Author: Paul Fanelli;CECAT Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Author: Scott Mowery Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Author: Adam Grodsky;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf Author: Thomas F. Landon Keywords/Tags: bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Author: Richard Bourgerie Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf Author: FOD Team Leads Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf Author: CO-OPS Engineering Division Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.4_WaterTempComparisonSOP.pdf Author: yumiko Keywords/Tags: SOM,Station Operation and Maintenance |
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf Author: Jason Standridge Keywords/Tags: SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal |
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp |
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf Author: Keith Brkich;Nathan Holcomb Keywords/Tags: SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage, |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf Author: Nathan Holcomb Keywords/Tags: SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Author: Christopher Paternostro;Richard Bourgerie Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf Author: Adam Grodsky Keywords/Tags: SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq |
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf Author: Adam.Grodsky@noaa.gov Keywords/Tags: SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG |
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf Author: Caleb Gostnell, SIL Keywords/Tags: SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Author: Greg Dusek Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Author: Carl Kammerer Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.2.3.3.C13_VDatum_Project_Guidelines.pdf Author: Manoj Samant Keywords/Tags: PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL, |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf Author: CO-OPS Engineering Division;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf Author: Manoj Samant, Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf Author: Stephen Gill, CO-OPS Keywords/Tags: NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf Author: Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf Author: Warren Krug Keywords/Tags: SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf Author: Chris McGrath Keywords/Tags: SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf Author: Jason Standridge Keywords/Tags: geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS |
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf Author: SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf Author: Chris McGrath Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf Author: CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED |
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf Author: CIL;SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf Author: SIL;CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf Author: CIL;SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf Author: SIL;CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Author: Rachel Krasna, Steve Bassett Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |
Filename | Author | Keywords/Tags |
---|---|---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf | Adam Grodsky;Richard Bourgerie | SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf | CO-OPS Engineering Division | SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD |
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf | CO-OPS Engineering Division | SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf | Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf | Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf | Darren Wright, James Sprenke, Charles Payton | SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf | Adam Grodsky, COET | SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf | Manoj Samant | SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf | manoj.samant | bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf | George Leigh, Kevin Bashant, NGS | concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf | George Leigh, Kevin Bashant, NGS | outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf | Carl Kammerer | ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf | Carl Kammerer, CECAT | FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls | Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary | SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT |
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf | ||
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf | Chris McGrath | Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf | CIL | 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf | U.S. Department of Commerce | expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M |
4.1.3.5_CIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf | CO-OPS | Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf | Sutron Corporation | COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf | Thomas F. Landon | ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
7.3.B.1.1_C-MIST_User_Manual.pdf | Paul Fanelli;CECAT | dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf | Scott Mowery | pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf | Adam Grodsky;Minilek Hailegeberel | SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf | Thomas F. Landon | bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf | Richard Bourgerie | dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf | FOD Team Leads | SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf | CO-OPS Engineering Division | Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.4_WaterTempComparisonSOP.pdf | yumiko | SOM,Station Operation and Maintenance |
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf | Jason Standridge | SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal |
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf | Caleb Gostnell | SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp |
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf | Keith Brkich;Nathan Holcomb | SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage, |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf | Nathan Holcomb | SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf | Caleb Gostnell | SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf | Christopher Paternostro;Richard Bourgerie | CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf | Adam Grodsky | SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq |
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf | Adam.Grodsky@noaa.gov | SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG |
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf | Caleb Gostnell, SIL | SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx | Greg Dusek | currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf | Christopher Paternostro | currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf | Carl Kammerer | currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.2.3.3.C13_VDatum_Project_Guidelines.pdf | Manoj Samant | PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL, |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf | CO-OPS Engineering Division | SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf | CO-OPS Engineering Division;Minilek Hailegeberel | SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf | Manoj Samant, Minilek Hailegeberel | SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf | Stephen Gill, CO-OPS | NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf | Minilek Hailegeberel | SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf | Warren Krug | SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf | Chris McGrath | SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf | Jason Standridge | geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS |
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf | SIL | SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf | Chris McGrath | SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf | CIL | SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED |
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf | Caleb Gostnell | SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf | CIL;SIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf | SIL;CIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf | CIL;SIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf | SIL;CIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf | Caleb Gostnell | SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf | Rachel Krasna, Steve Bassett | SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |